Internal Strip-Outs & Site Preparation

Internal strip-out and site preparation services across commercial, industrial and residential sites in NSW and ACT.

Professional Internal Strip-Outs & Site Preparation

On paper, a strip-out is a straightforward exercise.

Remove the fixtures and fittings. Take up the floor coverings. Pull down the partitions. Dispose of the lot and hand the space back ready for the next stage of works. The reality of most strip-outs and site preparation projects is very different.

Gallant handles internal strip-outs across commercial, industrial and residential sites, including live and occupied buildings. Our technicians will survey before quoting, strip fixtures, partitions and floor coverings in sequence, and separate the waste into its disposal streams. Gallant provides full hazardous materials removal in-house, under its own licence, rather than subcontracting out to a third party.

WHO WE WORK WITH​

Commercial

Offices, retail, warehouses, and all commercial premises.

Industrial

Factories, large-scale warehouses, and development projects.​

Residential

Residential services for homes, townhouses, and apartments.​

Experienced Guidance From Start to Finish

Gallant manages internal strip-out and site preparation works across commercial, industrial and residential environments.

The work typically involves the removal and disposal of fixtures, fittings, partitions and floor coverings (both hazardous and non-hazardous materials) with full waste management and disposal handled throughout.

A lot of that work happens in live and occupied buildings. Tenants in the floor above. A business operating downstairs. As a team, we have extensive experience working to those conditions. Managing access, sequencing, and safety to minimise disruption to neighbouring premises throughout the works.

All works are carried out to specification. No mess left behind: just a clean, safe environment.

Our Case Studies

Internal Strip-Out & Site Preparation | Canberra

The Project

Gallant was engaged as demolition subcontractor on the refurbishment of an office building inside a secure, operating government precinct in Canberra. All personnel were security cleared and inducted, and the programme was run under the project WHS management plan and the precinct preliminaries.

The Scope

Bathroom and kitchenette strip-out across four levels, three bathrooms and two kitchenettes per level, plus locker rooms and ablutions at basement level. Wall and floor tiles were stripped and all fixtures, cabinetry and splashbacks removed, alongside canopy roof membrane strip-out, edge battens and perimeter fixings completed to all four levels. When three layers of floor tile were found in the Stage 1 bathrooms in place of the single layer allowed, the additional works were priced and completed without impacting the programme.

The Precaution Measures

All demolition material was sorted and segregated on site into designated waste streams in accordance with the precinct preliminaries and presented at base collection points for the site waste contractor, managed under Gallant’s ISO 14001 certified environmental system. Fatigue management and daily attendance records were maintained and submitted to the principal contractor throughout.

The Outcome

Delivered progressively level by level, each stage handed back ready for following trades, with the unforeseen tile variation absorbed inside the original programme. The precinct operated normally throughout and every level was released clean, compliant and prepared for fit-out.

Our Process

INITIAL
REVIEW

We review project details and site requirements to understand scope, risks and compliance considerations.

Planning &
Methodology

We develop a clear and compliant approach to the works, including methodology, safety controls and sequencing.

Project
Delivery

Our team delivers the works methodically, maintaining strict safety and environmental controls throughout.

Clearance &
Compliance

We work with occupational hygienists to ensure all works meet regulatory requirements and clearance standards.

Handover

We provide all required documentation, leaving the site safe, compliant and ready for the next stage.

Why choose Gallant Contracting?

We quote properly before work starts. If the scope changes mid job, we will let you know before any variation, not after.

We have real experience across hazardous materials, demolition and commercial construction. The kind of background that matters when a strip-out turns up something unexpected.

ISO-certified safety, environmental and quality systems on every site. Controls in place before work starts, maintained throughout.

Reliable team with clear communication. Which is particularly important on jobs where we’re working around other people.

Most strip-outs involve a mix of materials. Being able to manage both keeps the job moving forward with minimal disruption.

Our Qualifications

Class A & Class B Asbestos Removal Licence

SafeWork NSW Licensed Contractor

Contact gallant

Every project starts with a conversation. Whether you have a full scope ready or just need some early advice, we’re happy to talk it through. Reach out to the team and we’ll be in touch.

EMAIL
info@gallantcontracting.com.au

PHONE
0422 838 982

LOCATIONS
Sydney NSW
Canberra ACT